Forecast and evaluation of COVID-19 spreading in USA with reduced-space Gaussian process regression RMA Velásquez, JVM Lara Chaos, Solitons & Fractals 136, 109924, 2020 | 83 | 2020 |
The need of creating a new nominal creepage distance in accordance with heaviest pollution 500 kV overhead line insulators RMA Velásquez, JVM Lara Engineering Failure Analysis 86, 21-32, 2018 | 48 | 2018 |
Principal components analysis and adaptive decision system based on fuzzy logic for power transformer RMA Velásquez, JVM Lara Fuzzy Information and Engineering 9 (4), 493-514, 2017 | 48 | 2017 |
Reliability, availability and maintainability study for failure analysis in series capacitor bank RMA Velásquez, JVM Lara Engineering Failure Analysis 86, 158-167, 2018 | 44 | 2018 |
Knowledge management in two universities before and during the COVID-19 effect in Peru RMA Velásquez, JVM Lara Technology in Society 64, 101479, 2021 | 39 | 2021 |
Converting data into knowledge for preventing failures in power transformers RMA Velásquez, JVM Lara, A Melgar Engineering Failure Analysis 101, 215-229, 2019 | 34 | 2019 |
Corrosive Sulphur effect in power and distribution transformers failures and treatments RMA Velásquez, JVM Lara Engineering Failure Analysis 92, 240-267, 2018 | 34 | 2018 |
Gaussian approach for probability and correlation between the number of COVID-19 cases and the air pollution in Lima RMA Velásquez, JVM Lara Urban Climate 33, 100664, 2020 | 33 | 2020 |
Bushing failure in power transformers and the influence of moisture with the spectroscopy test RMA Velásquez, JVM Lara Engineering Failure Analysis 94, 300-312, 2018 | 30 | 2018 |
Insulation failure caused by special pollution around industrial environments RMA Velásquez Engineering Failure Analysis 102, 123-135, 2019 | 29 | 2019 |
Electrical assessment by lightning phenomenon in power lines of double circuit RMA Velasquez, JVM Lara IEEE Latin America Transactions 14 (5), 2217-2225, 2016 | 29 | 2016 |
Ruptures in overhead ground wire—Transmission line 220 kV RMA Velásquez, JVM Lara Engineering Failure Analysis 87, 1-14, 2018 | 28 | 2018 |
Life estimation of shunt power reactors considering a failure core heating by floating potentials RMA Velásquez, JVM Lara Engineering Failure Analysis 86, 142-157, 2018 | 28 | 2018 |
Root cause analysis improved with machine learning for failure analysis in power transformers RMA Velásquez, JVM Lara Engineering Failure Analysis 115, 104684, 2020 | 26 | 2020 |
Circuit breakers 500 kV degradation in substation reactors caused by inductive current RMA Velásquez, JVM Lara Engineering Failure Analysis 90, 64-81, 2018 | 26 | 2018 |
Support vector machine and tree models for oil and Kraft degradation in power transformers RMA Velásquez Engineering Failure Analysis 127, 105488, 2021 | 24 | 2021 |
Expert system for power transformer diagnosis RMA Velasquez, JVM Lara 2017 IEEE XXIV international conference on electronics, electrical …, 2017 | 24 | 2017 |
Harmonic failure in the filter of Static Var Compensator RMA Velásquez, JVM Lara Engineering Failure Analysis 107, 104207, 2020 | 23 | 2020 |
Current transformer failure caused by electric field associated to circuit breaker and pollution in 500 kV substations RMA Velásquez, JVM Lara Engineering Failure Analysis 92, 163-181, 2018 | 23 | 2018 |
Implementation of knowledge management in energy companies RMA Velasquez, JVM Lara 2017 IEEE XXIV International Conference on Electronics, Electrical …, 2017 | 21 | 2017 |