Seguir
Subanatarajan Subbiah
Subanatarajan Subbiah
Chief Product Owner, SAP SE
Dirección de correo verificada de sap.com
Título
Citado por
Citado por
Año
The network formation assay: a spatially standardized neurite outgrowth analytical display for neurotoxicity screening
JP Frimat, J Sisnaiske, S Subbiah, H Menne, P Godoy, P Lampen, M Leist, ...
Lab on a Chip 10 (6), 701-709, 2010
1362010
Conditional inference trees for knowledge extraction from motor health condition data
A Sarda-Espinosa, S Subbiah, T Bartz-Beielstein
Engineering Applications of Artificial Intelligence 62, 26-37, 2017
612017
Scheduling of multi-product batch plants based upon timed automata models
S Panek, S Engell, S Subbiah, O Stursberg
Computers & Chemical Engineering 32 (1-2), 275-291, 2008
492008
Modeling machine health using gated recurrent units with entity embeddings and k-means clustering
I Amihai, M Chioua, R Gitzel, AM Kotriwala, D Pareschi, G Sosale, ...
2018 IEEE 16th International Conference on Industrial Informatics (INDIN …, 2018
312018
Short-term scheduling of multi-product batch plants with sequence-dependent changeovers using timed automata models
S Subbiah, S Engell
Computer Aided Chemical Engineering 28, 1201-1206, 2010
262010
An intuitive and efficient approach to process scheduling with sequence-dependent changeovers using timed automata models
S Subbiah, C Schoppmeyer, S Engell
Industrial & Engineering Chemistry Research 50 (9), 5131-5152, 2011
232011
Multi-product batch scheduling with intermediate due dates using priced timed automata models
S Subbiah, T Tometzki, S Panek, S Engell
Computers & Chemical Engineering 33 (10), 1661-1676, 2009
222009
A comparative study on data-driven prognostic approaches using fleet knowledge
L Cristaldi, G Leone, R Ottoboni, S Subbiah, S Turrin
2016 IEEE International Instrumentation and Measurement Technology …, 2016
162016
An algorithm for data-driven prognostics based on statistical analysis of condition monitoring data on a fleet level
S Turrin, S Subbiah, G Leone, L Cristaldi
2015 ieee international instrumentation and measurement technology …, 2015
122015
Efficient scheduling of batch plants using reachability tree search for timed automata with lower bound computations
S Subbiah, C Schoppmeyer, S Engell
Computer Aided Chemical Engineering 29, 930-934, 2011
102011
Timed automata models for batch scheduling with sequence-dependent changeovers
S Subbiah, S Engell
Computer Aided Chemical Engineering 27, 1515-1520, 2009
92009
Operation of flexible multiproduct modular continuous polymerization plants
C Schoppmeyer, H Vermue, S Subbiah, D Kohlmann, P Ferlin, S Engell
Macromolecular Reaction Engineering 10 (4), 435-457, 2016
82016
Dynamic scheduling of shuttle robots in the warehouse of a polymer plant based on dynamically configured timed automata models
C Schoppmeyer, S Subbiah, JM De La Fuente Valdès, S Engell
Industrial & Engineering Chemistry Research 53 (44), 17135-17154, 2014
72014
Optimal management of shuttle robots in a high-rise warehouse using timed automata models
S Subbiah, C Schoppmeyer, JMDLF Valdès, C Sonntag, S Engell
IFAC Proceedings Volumes 46 (9), 1358-1363, 2013
62013
Modeling and solving batch scheduling problems with various storage policies and operational policies using timed automata
C Schoppmeyer, S Subbiah, S Engell
Computer Aided Chemical Engineering 31, 635-639, 2012
62012
A Data Quality Dashboard for CMMS Data.
R Gitzel, S Subbiah, C Ganz
ICORES, 170-177, 2018
52018
An easy-to-use and flexible scheduling component
I Harjunkoski, M Hollender, R Bauer, J Doppelhamer, S Subbiah, ...
ABB Review 3, 92-97, 2017
52017
Timed automata based scheduling for a miniature pipeless plant with mobile robots
C Schoppmeyer, M Hüfner, S Subbiah, S Engell
2012 IEEE International Conference on Control Applications, 240-245, 2012
42012
Effective batch scheduling with sequence-dependent changeovers using reachability analysis of timed automata combined with lower bound computations
C Schoppmeyer, S Subbiah, S Bendiganahalli-Deveerappa, S Engell
IFAC Proceedings Volumes 45 (6), 75-80, 2012
32012
Batch scheduling with intermediate due dates using timed automata models
S Subbiah, T Tometzki, S Engell
Computer Aided Chemical Engineering 25, 151-156, 2008
32008
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20